SH 288 Reconstruction Project – Southmore Bridge Demolition

The SH 288 Reconstruction Project includes improvements that encompass a 10.3-mile stretch from US 59 to the Harris County line at Clear Creek and involves the expansion of three major interchanges:

  • Beltway 8, which will include (8) new direct connector/ramp bridges.
  • Loop 610, which will include (8) new direct connector/ramp bridges.
  • The Texas Medical Center, which will include (2) new direct connector/ramp bridges.

Stiver Engineering provided construction engineering through the demolition design and plans for the Southmore Boulevard Bridge, Holly Hall Street Bridge, 610 Interchange Bridges, SH 288 Bridges at Bellfort Street and SH 288 Bridges at Holmes Road.