Plum Creek HDD Project

We Get Things Done
Plum Creek Hdd Project

Plum Creek HDD Project

Stiver Engineering provided the contractor with an alternate tunneling method for a 6-inch diameter force main.  The alternate design consisted of a horizontal directional drill (HDD) that was 21 ft. beneath an existing railroad.  The pull forces and pipe stresses were analyzed and a profile was delivered to the contractor for construction.