Mill Creek Wastewater Treatment Plant Pipe Rehabilitation Design

We Get Things Done
project image

Mill Creek Wastewater Treatment Plant Pipe Rehabilitation Design

Using Danby liner and grout, Stiver Engineering provided a pipe rehabilitation design for a 93-inch arch pipe at a wastewater treatment plant in Cincinnati, Ohio. The existing pipe section along with the Danby liner and grout allowed us to create a composite section. The composite section was designed so the contractor could provide a clear span over existing utilities. Stiver also designed bulkheads inside the existing 93-inch arch pipe to provide access for the pipe’s rehabilitation.