
Houston Rapid Transit – Pit “E” – Valve Vault Construction Project
Downtown Houston, Texas
The Houston rapid transit project specified that two 36-inch supply and return lines be relocated for the construction of the Metro Light Rail Downtown Line in Houston, Texas.
Stiver Engineering provided construction consulting by designing the shoring system for the excavation beneath Rusk Street in Downtown Houston, which was built using soldier piles, timber lagging, wale sets, and cross struts.
Start A Project