Esplanade Boulevard 108-Inch Waterline Project

As part of a 108-inch transmission waterline project along Esplanade Boulevard between Imperial Valley Drive and Green Plaza in Houston, Stiver Engineering provided a custom lifting plan for the bottom elbow of the waterline at one of our shaft designs. The fitting had to be lifted and held in place while it was welded to the carrier pipe in the tunnel.