Houston Rapid Transit – Pit “E” – Valve Vault Construction Project

We Get Things Done
You are here:
Houston Rapid Transit - Pit “e” - Valve Vault Construction Project

Houston Rapid Transit – Pit “E” – Valve Vault Construction Project

The Houston rapid transit project specified that two 36-inch supply and return lines be relocated for the construction of the Metro Light Rail Downtown Line in Houston, Texas.

Stiver Engineering provided construction engineering by designing the shoring system for the excavation beneath Rusk Street in Downtown Houston, which was built using soldier piles, timber lagging, wale sets, and cross struts.